Energy
PEnergy generation ftom processing
eec's policy in the Program is to be a
convincing pioneering commercial user or an intelligent middle-man, who
provides to the users a comprehensive, innovative and highly efficient
power generation technology from waste management.
eec makes financial modeling, orders the equipment, supplies and
operates together with the local country regional municipality.
The system converts almost any waste material (municipal and
industrial) into usable material products―electricity
with very high rate of efficiency, recicables (if the
Developer so requires) and even a very small quantity of debris that could be applied in pavement.
Municipal Solid Wastes (MSW) is the ideal fuel. The vast majority of MSW are combustible and the heat converts into electric power with high efficiency.
The typical amount of net energy that
can be produced per ton of MSW is about 600 MT per day will produce at least 20 MW
of electrical power through
internal combustion engine, or more by the plasma
reactors.
The Project's profitability, represented by so called
accelerated
amortization loan period is about 4 years.*
The loan life is supposed up to 7 years with at least
2-year grace period.
To get an idea about one type of the technology processes look at the simple block-chart
(text in Bulgarian), click the hard reader
here right and peruse it.
This scheme was particularly delivered for our new customers and is
published by courtesy of QRE, Inc.
Such commercial development could provide a technology not
only to meet Clean Air requirements but also to lower
energy costs for the regional industry.
is is a very brief description of our
Energy
Printable version in DOCX-format