West Wind Land

The so called West Land is in west-north of Sofia, 40 km faraway. The wind area is on the ridge of a small mountain,  sloping down to a wedge-(V)-shaped gorge mountain wind chute.

east electric company (eec) works up since 2005 as being one of most valuable area for development of wind farm in Bulgaria.
See the general concluded data of the aerometry in the table below. Click the Word-icon on the right botton below for the whole information.

On the this site 100,000 sq.m. area min 60 wind turbines* of 1.5 up tp 2.5 MW each could be erected, which totals 90 - 150 MW output installed power. An extreme <br>
feature of this area is wind direction (click the red rouse to see the wind rouse definite for October 2005).

ClickOn the rouse icon on the left to see the wind rouse construed by the data as sown in the Table below referring to 2008 annual averaged ultra- sound measuring by<br>
the software of US Air Force.

West Wind Land - Ultrasound Measurement at 10 m and software extrapolation to 80 m height

Month:

1

2

3

4

5

6

7

8

9

10

11

12

AVERAGE

 

Speed on 80-m height

8.05

8.46

8.05

7.37

7.15

5.85

5.36

5.20

5.36

6.18

6.34

7.15

6.71

Expected annual average:

Destination

N

NE

EE

SE

S

SW

W

WN

TOTAL

 

 

 

Percent hours with velocity of >= 6 m/sec, 73%

Percent Cases

3

11

21

5

4

9

25

22

100

 

 

 

Number of hours with wind velocity >=6 m/s,6,4

NOTE. Based on the definitely height-on-worded wind rouse the following effect of the intensity of the wind velocity, measured on 10 m height, is enhanced: (i) by rate of 1.25 for wind with velocity 3 up to 5 m/sec, and
(ii) by rate of 1.09 for wind with velocity over 5 m/sec and then increased by special software to refer to 80 m height.

Business Proposal

The Investor is proposed and will acquire:  (i) 25 acre (+20% optional) EU land (≈100,000 sq.m.) with certified exchange of its purpose—from agriculture into industrial land, wherefore its price jumps many times;  (ii) full set of certificates, documents and other papers and legal information for loan application, pre- paid, obtained and collected within 3 years;  (iii) the opportunity of professional service about the best loan conditions, hi-tech US equipment against and assistance in the local country construction work and project supervision for $3M+ only, whereupon he could invest consecutively or at once up to $200M for renew- able power generation in a EU country where the local law stipulates its purchase by the state on the highest eco-power generation encouraging price over the world, ˆ0.875 p.kWh ($2.12),** recovering the investment within 3 yers.

_______________________

* The exact number and the generators'output power debend on both the construction design and supplier of the equipment for each site.

 ** Under meeting specific conditio