West Wind Land
The so called West Land is in west-north of Sofia, 40 km faraway. The wind area is
on the ridge of a small mountain,
sloping down to a wedge-(V)-shaped gorge mountain wind chute.
east
electric
company
(eec)
works up since 2005 as being one of most valuable area for development
of wind farm in Bulgaria.
See the general concluded data of the aerometry in the table below. Click the
Word-icon on the right botton below for the whole information.
On the this site 100,000 sq.m. area min 60 wind turbines*
of 1.5 up tp 2.5 MW each could be erected, which totals 90 - 150 MW
output installed power.
An extreme <br> |
|
ClickOn the rouse icon on the left to see the wind rouse
construed by the data as sown in the Table below referring to 2008 annual
averaged ultra- sound measuring by<br> West Wind Land - Ultrasound Measurement at 10 m and software extrapolation to 80 m height |
Month: |
1 |
2 |
3 |
4 |
5 |
6 |
7 |
8 |
9 |
10 |
11 |
12 |
AVERAGE |
|
Speed on 80-m height |
8.05 |
8.46 |
8.05 |
7.37 |
7.15 |
5.85 |
5.36 |
5.20 |
5.36 |
6.18 |
6.34 |
7.15 |
6.71 |
Expected annual average: |
Destination |
N |
NE |
EE |
SE |
S |
SW |
W |
WN |
TOTAL |
|
|
|
Percent hours with velocity of >= 6 m/sec, 73% |
|
Percent Cases |
3 |
11 |
21 |
5 |
4 |
9 |
25 |
22 |
100 |
|
|
|
Number of hours with wind velocity >=6 m/s,6,4 |
NOTE.
Based on the definitely height-on-worded wind rouse the following effect
of the intensity of the wind velocity, measured on 10 m height, is enhanced: (i) by rate of 1.25 for wind
with velocity 3 up to 5 m/sec, and
(ii) by rate of 1.09 for wind
with velocity over 5 m/sec and then increased by special software to
refer to 80 m height.
Business Proposal
The Investor is proposed and will acquire: (i) 25 acre (+20% optional) EU land (≈100,000 sq.m.) with certified exchange of its purpose—from agriculture into industrial land, wherefore its price jumps many times; (ii) full set of certificates, documents and other papers and legal information for loan application, pre- paid, obtained and collected within 3 years; (iii) the opportunity of professional service about the best loan conditions, hi-tech US equipment against and assistance in the local country construction work and project supervision for $3M+ only, whereupon he could invest consecutively or at once up to $200M for renew- able power generation in a EU country where the local law stipulates its purchase by the state on the highest eco-power generation encouraging price over the world, ˆ0.875 p.kWh ($2.12),** recovering the investment within 3 yers.
_______________________
* The exact number and the generators'output power debend on both the construction design and supplier of the equipment for each site.
** Under meeting specific conditio